Know your role.
Build with clarity.

Your custom home, together

You make the decisions that shape your home. Your build team turns those decisions into a coordinated project. Here’s who does what—and what changes if you act as your own GC.
 

✳ One shared goal: clear decisions, clear ownership, and fewer surprises along the way.

build-team.webp

01 / The team

Four roles. One project.

Each person contributes in a different way. Knowing the handoffs keeps decisions moving and work on track.

Guides

Builder’s Rep

Your BuildAngel contact helps explain options, organize information, track decisions, and surface open questions.

Builds

Subcontractors

Perform their trades to the agreed scope, coordinate with the GC, and correct issues in their work.
 

Coordinates

General contractor

Hires and directs trades, manages scope, site, schedule and cost, coordinates inspections, and delivers the work.

Decides

Homeowner

Sets goals and budget, chooses design and finishes, approves changes and payments, and raises concerns early.

02 / Your part

Five ways to keep your build moving.

You don’t need to know how to build the house. You do need to give the team direction when your input is needed.

1 / Share your priorities.

Tell the team your must-haves, budget target, and where you can be flexible.

2 / Choose by the decision date.

Selections can affect pricing, ordering, and the schedule.

3 / Approve changes in writing.

Review the scope, price, and timing before changed work starts.

4 / Review costs and payment requests.

Ask about allowances, contingency, and completed work.

5 / Speak up early.

Share concerns through the GC and Builder’s Rep so the right person can act.

03 / A different path

Acting as your own GC?

You still make all the homeowner decisions. You also take responsibility for turning plans into a finished home: hiring trades, sequencing work, managing the site, and resolving problems.
 

This is a demanding construction management role. BuildAngel’s Rep can guide and organize information within the agreed service scope, but is not a substitute for a GC.

Your added GC responsibilities

  • Define trade scopes, vet trades, and sign contracts.

  • Sequence work and resolve conflicts between trades.

  • Arrange permits, inspections, and site access.

  • Track commitments, invoices, draws, and cash needs.

  • Address site control, safety, corrections, and warranty follow-through.

Before you choose this path

Are you ready to manage the build?

Acting as GC takes more than finding good subcontractors. You need enough knowledge and regular availability to spot gaps, make informed calls, and keep multiple trades working toward the same plans.

01 / PLANS

Read construction documents

Understand plans, specifications, code questions, and when to bring an architect or engineer back in.

04 / FIELD JUDGMENT

Recognize problems early

Check work against the plans, identify conflicts, and get qualified help before mistakes are covered up.

02 / SEQUENCING

Know what happens next

Coordinate dependencies, lead times, site readiness, and inspections before they hold up the next trade.

05 / MONEY & RECORDS

Control the budget
 

Track committed costs, changes, invoices, lien paperwork, cash needs, and lender draw requirements.

03 / TRADE SCOPES

Find the gaps in bids
 

Compare exclusions and allowances, verify qualifications and coverage, and write clear contracts.​

06 / TIME & SITE

Be consistently available

Answer weekday calls, visit the site, solve trade conflicts, and coordinate safety and access.
 

Pause if several of these are unfamiliar.

Consider hiring an experienced GC or a qualified construction manager with clearly contracted duties. Before committing to owner-builder, confirm local permit and licensing rules, insurance, and whether your lender permits this arrangement. The homeowner can remain responsible for gaps even when individual trades are licensed.

How a decision moves

One request.
A clear path.

If you want a change, start with the GC and Builder’s Rep. The GC works through the trade details; the Rep keeps the question and answer visible; you authorize the decision.
 

Keep site directions in this path so everyone works from the same approved scope.

1 / Homeowner requests a change

Describe the outcome you want.

2 / GC checks options with trades

Scope, cost, timing, and feasibility.

3 / Builder’s Rep tracks the answer

Open questions stay visible.

4 / Homeowner approves in writing

Then the GC coordinates the changed work.

Reference / Responsibility chart

Who owns each step?

For a project with a hired GC. If you are the GC, you take on both the Homeowner and GC columns.

A Accountable · R Does the work
C Consulted · I Informed

Activity
Homeowner Role
General Contractor Role
Subcontractors Role
Builder’s Representative Role
Coordinate closeout and corrections
C
A
R
C
Authorize owner payments
A/R
C
I
C
Approve scope and price changes
A/R
C
I
C
Price and schedule a proposed change
C
A/R
C
C
Perform and correct trade work
I
A
R
I
Plan site work and manage safety*
I
A
R
I
Coordinate permits and inspections*
C
A/R
C
I
Hire and coordinate trades
I
A/R
R
C
Develop scopes, budget, and schedule
C
A/R
C
C
Organize decision list and owner updates
C
C
I
A/R
Set goals, budget, and design choices
A/R
C
I
C

* Contracts and local requirements determine formal duties. Each trade has its own safety obligations. Design professionals, lenders, and building officials have separate roles.